Vietsovpetro completed installation of wellhead platform topside block at Bach Ho oil field

Fri, 13 Sep 2024 14:29:00  |  Print  |  Email   Share:

On September 11, the Vietnam – Russia oil and gas joint venture Vietsovpetro said that it completed the installation of the wellhead platform topside block of the BK-23 drilling rig at Lot 09.1 of Bach Ho oil field, 145 kilometres to the southeast of Vung Tau city a day earlier.

Vietsovpetro successfully installs wellhead platform topside at Bach Ho oil fieldVietsovpetro completed installation of wellhead platform topside at Bach Ho oil field: Overview of Bach Ho oil field. (Photo: PetroVietnam)

More than 130 workers used a crane vessel to install the 760-tonne block in accordance with schedule, ensuring safety and the most rational costs despite bad weather conditions caused by typhoon Yagi.

BK-23, an unmanned wellhead platform, is located near the existing BK-14 oil rig, which will receive oil and gas from the former through an auxiliary equipment system and connecting pipelines.

By: WVR/VNA

Source: https://en.baoquocte.vn/vietsovpetro-completed-installation-of-wellhead-platform-topside-block-at-bach-ho-oil-field-285871.html

---------------------------------------------

Back     Up to top   

Same category News :

Copyright © 2016 by the Chamber of Commerce and Industry of Vietnam - VCCI
Write "Chamber of Commerce and Industry of Vietnam"
or www.vcci.org.vn; www.vcci.com.vn; www.vcci.net.vn the release of information from this Website.
Designed and developed by Vietkent